非标安装图说明: | ||||
1、最大承重为: 50KG;玻璃必须钢化; | ||||
2、订购导轨时,不包导轨钻孔,孔需施工时加工; | ||||
3、此款180°最大安装长度为1.8米,适合夹8mm~ 10mm玻璃; | ||||
4、用户要严格按照安装图开孔,安装玻璃; | ||||
Nonstandard shower room installation diagram | ||||
1.It support maximun 50 kg.it is necessary to toughen the glass after making the holes. | ||||
2.The guide rail isn't drilling holes,The holes should be drilled according to the installation. | ||||
3.180° maximun installation length is 1.8m.suitablefor 8mm-10mm glass. | ||||
4.When diling holes in glass.Please do strictly in accordance with the dimensions in the installation diagram. |
30×10 SQUARE PIPE PLANE INSTALLATION DIAGRAM
1、偏心轮45mm
1、Eccentric wheel 45mm
2、管夹
2、Pipe clamp
3、防跳钉
3、Security nail
4、管套
4、Pipe sleeve
5、定位器
5、Stopper
6、止摆器
6、Floor guide
7、暗拉手
7、Hidden handle
8、导轨30*10mm
8、Guide rail 30*10mm